top of page

Prefabricated Steel Framing

Solve the challenges of today's construction by building better, faster and smarter with CAD integrated framing technology. 

Getting Started. Why Smartsteel?

STRAIGHT & STRONG

Won't twist, warp or

shrink over time

SAVE TIME ON SITE

No need to straighten

or plane walls

FASTER TURN-AROUND

Greater return on your investments

LESS COSTS

Replace costly structural steel designs & heavy equipments

TERMITE PROOF

Steel is 100% termite

& borer proof

IN-HOUSE DESIGN

In-house detailing, certification & manufacturing

DESIGN FLEXIBILITY

Greater strength-to-weight ratio for longer spans

EASY TO INSTALL

Simple, lightweight &

NO welding works

RELIABLE SUPPLY

In-house fabrication with established supply chain

TECHNICAL EXPERTISE

Commited to support you

& your business

NON-COMBUSTIBLE

Frame made from steel won't catch fire

SUSTAINABLE

Steel is 100%

recyclable

Accelerate Timelines with Steel Framing

Smartsteel construction timeline graphic

Explore Steel Frame Models.

A-frame cabin 7080.jpg

A-Frame 7080
56 sqm

More space for you to play, relax and enjoy.

​

From ₱570,000

Buy >

7 x 8 m

Size

​

​

Up to

5 provisions

Living room, dining room,

loft, kitchen, toilet & bath

​​​​​​​​​​

5 days

Fast assembly time

A-frame tiny open space.jpg

A-Frame Tiny
31 sqm

Luxury.

Tiny sized.

​

From ₱215,000

Buy >

4.8 x 6.5 m

Size

​​

​​

​​

​​

Open space

​​​​​​​​​

2 days

Fast assembly time

A-frame tiny.jpg

A-Frame Tiny Plus
31 sqm

Your luxurious tiny cabin

plus the essentials.

​

From ₱230,000

Buy >

4.8 x 6.5 m

Size

​

​

Up to

4 provisions

Living room, dining room,

kitchen, toilet & bath

​​​​​​​​​​

2 days

Fast assembly time

A-frame tiny plus.jpg

A-Frame Tiny Loft
31 sqm

Dream away with your

tiny loft cabin.

​​

From â‚±250,000

Buy >

4.8 x 6.5 m

Size

​

​

Up to

5 provisions

Living room, dining room,

loft, kitchen, toilet & bath

​​​​

2 days

Fast assembly time

Let's Discuss 
Your Next Project.

Together We Build Smarter

​

Email

build@smartsteel.com.ph

​

Website

www.smartsteel.com.ph

© 2025 Smartsteel Philippines Inc.

​

Smartsteel Philippines Inc. reserves the right to modify, change, and update product information, colors, specifications, prices, without notice. Photography & models are for illustration purposes only.

bottom of page